A. When an application has been made to the cashier for water and/or sewer service connection, the same will be installed as soon as practicable by the borough. The work to be done by the borough shall be all work between the main and the property line, and all material and labor used in making such connection shall be charged on a cost plus percentage basis, as determined by resolution of the assembly to cover costs.

B. Charges for turning on (or turning off) existing services shall be a fee established by resolution of the assembly or actual costs, whichever is greater.